Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1452.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Feb 01, 2021     More FAB work - (3 hours)       Category: Firewall
Spent the day continuing to work on FAB. Match drilled the remaining two holes from the back plate to the fuel servo using the gasket supplied in the injector kit. Also drilled out the center of the back plate to match the transit duct flow thru hole. Needed some more epoxy flox to seal the gap between the two. Made a dummy Skybolt bracket to drill a new hole in the bottom of the cowl to get a better fit on one hole and mounted the aft baffle support bracket. Used some surplus epoxy to beef up the small fiberglass area near the alt air door.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.